PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Intalling steel columns at Derrick -3 Facing South-East (800x600).jpg J7 and M7 Columns Facing East (800x600).jpg Started installing PVC pipe to provide temporary power to the building Facing North-East (800x600).jpg Installed conduit at column K-2.5 Facing West (800x600).jpg Welding Derrick -2 3rd Floor Facing West (800x600).jpg
Next page Intalling steel columns at Derrick -3 Facing South-East (800x600)
Intalling steel columns at Derrick -3 Facing South-East (800x600)